Worcester Business School

Spillages record 01.12.2020 – 30.11.2021

Date of spillageSpillageClean up actionCorrective Action
04/01/202115 litres of paint spilledPaint mopped up with cloths and put in general on-site waste area. Later burnt.Notice posted warning workers to be more careful
28/01/2021205 litre drum of solvents knocked over when storekeeper had to move drums to access plastic resin sacksHosepipe use to wash spillage into drain that discharges into lagoonNotice posted warning workers to be more careful
29/01/2021Loss of water – tap left on in men’s residential area.None required – residents swept water from buildingNone
30/03/2021Oil drum spilled on bare earth next to borehole 1None required – oil seeped into groundNone
03/04/2021Oil drum spilled on bare earth next to borehole 1None required – oil seeped into groundNone
22/06/2021Loss of water – tap left on in upstairs office area toilets and water leaked into chemical storage area below. 4 open drums of solvents filled up with water and overflowed onto concrete floor.Hosepipe use to wash spillage into drain that discharges into lagoonFixed ceiling
06/07/2021Used oil leaked from waste oil drum onto concrete floor around clean water drain in storage area.Oil brushed into drain and area washed down.Rusty waste oil drum patched and now in use
07/07/2021Oil drum spilled on bare earth next to borehole 1None required – oil seeped into groundNone
18/07/2021205 litre drum of solvents knocked over when storekeeper had to move drums to access plastic resin sacksHosepipe use to wash spillage into drain that discharges into lagoonNotice posted warning workers to be more careful
19/07/202185 litres of paint spilled. Paint covered plastic mouldings stacked on vehicle loading area floor (bare earth).None required paint seeped into ground/dried on surface. Ruined components disposed of in off-site waste area.Notice posted warning workers to be more careful
26/09/2021Split bag of polybutylene terephthalate found on shop floor. Half of plastic pellets spilled out.Workers picked up pellets by hand and replaced in storage bag. Dust remaining brushed out of factory door onto area by dormitories.Split in storage bag patched up. Instructions issued not to leave dust from plastic pellets in open area as dust seen blowing around and into office windows.
18/10/2021Air conditioning hydrochlorofluorocarbon refrigerant (HCFC) leaking from compressorNone – leak is continuingAwaiting engineer to fix aircon system.

Posted

in

by

Tags: